Wednesday, May 6, 2020

Ship Visit free essay sample

The purpose of the tow worthy survey was to ensure that all loose items on the barge are secured to be able to withstand the forces that could be experienced on the sea passage and that both the tug and barge were sea worthy. The surveyor took rounds daily to have a look at the existing conditions and to outline his expectations/requirements. The Fortuna had been in ZPMC shipyard since December 2010, for the fitting of a new stinger, and due to the long duration of stay in dry-dock the scope and volume of work required for the sea securing was quite large. However the crew worked very hard to ensure that vessel passed the tow worthy inspection and the certificate was finally issued on June 19, 0700LT (1) hour prior the scheduled departure time. In addition to having photographs of the sea fastenings taken as below have also included general information about the Fortuna and its pipe laying operations. We will write a custom essay sample on Ship Visit or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page It was also however noted that instead of the new officers who joined being initially trained or taught about the practical operations and handling of the barge, too much emphasis was instead being given to deal with the â€Å"audit† findings of the EXXON, including detailed power point presentations for the same but just a cursory explanation of the actual operation of the barge. 1. Securing on deck. 2. Securing in pipe laying gallery. 3. Securing on deck. 4. Securing on deck. 5. Securing on deck. General Layout: Fortuna is a pipe laying barge built ex ZPMC shipyard in 2010, general dimension as given below. She has an forward accommodation consisting of 4 accommodation decks and a helicopter deck. The pipe laying gallery is on the port side of the vessel and the center and starboard deck are free for pipe and miscellaneous equipment storage. The stinger purpose built for this project is installed on the aft port side of the vessel in line with the pipe laying gallery. The barge has (1) fixed crane on starboard main deck and (1) crawling crane.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.